Two-Storey Extension in Solihull – Case Study
Construction of a contemporary single-storey extension featuring a large curved glazed sun room, together with a new garage extension to the front side of the property and internal alterations to create a new kitchen, utility, gym and WC.
Solihull
18 weeks
£150,000 – £190,000
House Extensions
Project Gallery








Client Brief
The client wanted to significantly improve the ground floor living space and create a strong connection to the garden. The design included a large curved sun room with extensive glazing to maximise natural light, along with a new kitchen and supporting utility spaces. At the front of the property, a single-storey garage extension was also required to provide additional practical space while maintaining the appearance of the existing house.
Design, Planning and Scope of Works
Construction of a large single-storey rear extension incorporating a curved glazed sun room structure. Internal reconfiguration to form a new kitchen, utility room, gym and WC. Installation of full glazing systems across the curved elevation to create panoramic views of the garden. Construction of a single-storey garage extension to the front side of the property. Structural alterations to integrate the new spaces with the existing building. Full electrical, plumbing and heating installations, together with internal finishes and external works.
Construction Works
Works began with the foundations and structural framework for both the rear extension and the front garage extension. The curved sun room structure required careful setting out to achieve the sweeping form of the glazed elevation. Once the main structure was complete and weather-tight, internal works commenced including first fix services, insulation and partitions. The project then progressed through installation of the kitchen and internal spaces before glazing installation, finishing works and decoration.
Challenges and Solutions
The curved design of the sun room required precise structural setting out and coordination with the glazing system to achieve the continuous curved elevation. Integrating the new extension with the existing property while maintaining clean architectural lines also required careful detailing and sequencing of structural works.
Timeline
This house extensions in Solihull was completed in 18 weeks, within a budget of £150,000 – £190,000.
Outcome
The completed extension has transformed the ground floor of the property, creating a bright and spacious living environment with a striking curved sun room that opens towards the garden. The new kitchen and supporting spaces provide practical day-to-day functionality, while the garage extension adds additional usable space without compromising the overall design of the home.
Key Features
Curved glazed sun room
Contemporary single-storey rear extension
Kitchen and open living space
Utility room
Home gym
Ground floor WC
Single-storey garage extension
Large glazed elevations
Modern architectural design