Kitchen Extension in Droitwich Spa – Case Study
Rear infill extension and full ground floor refurbishment to create a large open-plan kitchen, dining and living space with modern finishes and improved connection to the garden.
Droitwich Spa
17 weeks
£115,000 – £130,000
Kitchen Extensions
Project Gallery



Client Brief
The clients wanted to modernise the rear of their home by filling the unused side space between the existing structures to create a larger kitchen and living area. The aim was to open up the ground floor, improve natural light and create a contemporary open-plan layout suitable for family living and entertaining.
Design, Planning and Scope of Works
Construction of a new infill extension with a new flat roof finished with a single-ply PVC membrane supplied and installed by Vanguard Water Proofing Systems Structural alterations to open up the existing house into the new extension. Full internal refurbishment including new flooring, installation of a WC and cloakroom, and construction of a large open-plan kitchen, dining and living area. Installation of large aluminium bifold doors and completion of new external patio works.
Construction Works
The project began with demolition and structural works to remove sections of the existing rear wall to create a fully open connection to the new extension. The infill structure was constructed with a new roof system and single-ply PVC covering. Once the building envelope was complete, the internal layout was opened up to form a single large living space before installing new floors, kitchen units with granite worktops, and completing the WC and cloakroom. External patio works were then completed to tie the house and garden together.
Challenges and Solutions
Working within the tight space between existing structures required careful sequencing of the structural works and roof construction while ensuring the property remained weatherproof and structurally supported during the opening up process.
Timeline
This kitchen extensions in Droitwich Spa was completed in 17 weeks, within a budget of £115,000 – £130,000.
Outcome
The completed project transformed a series of smaller rooms into a bright open-plan kitchen, dining and living space with direct access to the garden. The new extension blends seamlessly with the existing house while the modern finishes, granite worktops and large glazing create a contemporary family living environment.
Key Features
Infill extension
Single-ply PVC roof system
Structural opening of rear wall
Open-plan kitchen living dining space
Granite kitchen worktops
New WC and cloakroom
Aluminium bifold doors
New patio area