Car Park Resurfacing in West Midlands – Completed Project
Resurfacing and drainage improvement works to a factory car park, including pothole repairs, new tarmac, line marking and upgraded surface water drainage.
West Midlands
3 weekends (phased)
£30,000 – £40,000
Home Renovations
Project Gallery

Client Brief
A manufacturing company's car park had deteriorated significantly with extensive pothole damage, failed drainage causing standing water, and worn line markings creating safety concerns. The work needed to be phased to keep the factory operational throughout.
Design, Planning and Scope of Works
Excavation and removal of failed tarmac areas. Sub-base repair and compaction where the formation had failed. New surface water drainage channels and connection to existing outfall. Two-course tarmac surfacing — base course and wearing course. New line markings for parking bays, pedestrian walkways and fire assembly points. Installation of concrete wheel stops. Minor kerb repairs and verge reinstatement.
Construction Works
The work was phased across three weekends to minimise disruption to the factory. Phase one addressed the worst drainage failures — excavating and relaying drainage channels with new connections to the outfall. Phase two covered the main resurfacing — cutting out failed areas, repairing sub-base and laying new tarmac. Phase three completed the line marking, wheel stops and verge reinstatement.
Challenges and Solutions
Keeping the carpark operational
Timeline
This home renovations in West Midlands was completed in 3 weekends (phased), within a budget of £30,000 – £40,000.
Outcome
A fully functional car park with no standing water, clear markings and a professional appearance. The phased approach meant the factory continued operating without interruption throughout the works.
Key Features
Phased works around factory operations
New surface water drainage system
Two-course tarmac surfacing
Line marking and safety features
Sub-base repair and compaction
Thinking About a Similar Project in West Midlands?
We specialise in home renovations across West Midlands. Get in touch to discuss your project or use our free planning tools.
Or call us on 0800 999 88 55