Stone Barn Conversion in Worcestershire – Case Study
Conversion of an existing agricultural stable building into a one-bedroom barn-style dwelling, transforming a redundant farm structure into a high-quality residential space.
Worcestershire
18 weeks
£140,000 – £160,000
Home Renovations
Project Gallery








Client Brief
The client wanted to convert an unused stable building into a compact and comfortable one-bedroom home while retaining the character of the original agricultural structure. The aim was to modernise the building internally while preserving the rural barn aesthetic externally.
Design, Planning and Scope of Works
Structural alterations to the existing stable building including new foundations and blockwork walls where required. Construction of a new insulated timber frame structure, installation of new roof coverings, external timber cladding and windows. Internal works included installation of kitchen, bathroom, bedroom and living space along with full electrical, plumbing and heating systems.
Construction Works
The project began with stripping out the existing stable structure and preparing the slab and foundations. New blockwork and timber framing were installed to form the new building envelope, followed by insulation and roof construction. External timber cladding was then fitted to create a barn-style appearance, before completing internal works including the kitchen, bathroom, flooring and decoration.
Challenges and Solutions
Working with an existing agricultural structure required careful structural alterations and upgrades to meet residential building standards, including insulation, drainage and services installation while maintaining the proportions and appearance of the original stable building.
Timeline
This home renovations in Worcestershire was completed in 18 weeks, within a budget of £140,000 – £160,000.
Outcome
The completed conversion provides a modern one-bedroom barn-style home that blends naturally into the rural setting while delivering comfortable, energy-efficient living space.
Key Features
Barn conversion
Stable conversion
Timber-clad exterior
One-bedroom dwelling
Rural residential development
Agricultural building refurbishment
Modern kitchen installation
Thinking About a Similar Project in Worcestershire?
We specialise in home renovations across Worcestershire. Get in touch to discuss your project or use our free planning tools.
Or call us on 0800 999 88 55